Document panels, machinery, networks, power, safety and production schedules in one survey plan.
Add context to photos and measurements
Each image needs asset tag, orientation, date and permission. Verify cable distance and panel space apart from proposal assumptions.
Include operating constraints
Downtime windows, shifts and access permits matter as much as drawings. Record site owners and approval steps.