STARANALİZENGINEERING WHAT COMES NEXT
Automation · 12 October 2026

Collecting OEE data on production lines

Align downtime codes across the team before calculating availability, performance and quality.

Align downtime codes across the team before calculating availability, performance and quality.

01 /

Design downtime categories with operators

Separate planned stops, faults, material waits and speed loss. Too many choices burden operators; too few hide causes.

02 /

Align counter and quality definitions

Total and good-unit counts may differ. Verify shift, scrap and rework rules with sample records.

OEE data collection automationdowntime code standardproduction performance metric