Machine commissioning and FAT/SAT acceptance tests

Turn functionality, safety, communication and training into measurable acceptance steps.

Turn functionality, safety, communication and training into measurable acceptance steps.

01 /

Agree test conditions in advance

Document product, speed and material conditions. Each test needs an expected result, measurement method, evidence and owner.

02 /

Record field changes in handover files

Reflect parameter and wiring changes in drawings and software version. Track open items with an owner.

machine FAT SAT planautomation commissioningmachine acceptance criteria