Account for measurement latency when combining IMU, joint encoders and contact sensing for balance control.
Compare sensor timestamps
IMU and joint data arrive at different rates. Track timestamps and sequence so stale measurements do not enter control as if current.
Keep physical trials within safe bounds
Study centre-of-mass and contact changes in simulation first. Prepare a fall zone, low-energy limits and remote stop for physical trials.