Organize power, communication and sensor wiring to reduce interference and maintenance ambiguity.
Group harnesses by function
Separate motor wiring from sensitive sensor lines. Connector, pin and wire labels should match the diagram.
Plan service access and test points
Harnesses should resist vibration strain and ambiguous reconnection. Record continuity, polarity and insulation checks before energizing.