Size for workload and growth

Estimate compute, storage, rack space and network requirements for both the current workload and expected growth.

02 /

Coordinate power and cooling

UPS capacity, distribution paths, heat output and airflow should be reviewed together. Qualified professionals must verify electrical, fire and building requirements.

03 /

Plan operations and resilience

Monitoring, access control, backups, maintenance windows and incident procedures help keep the facility supportable after installation.