Update drawings with field changes to wires, terminals and devices at commissioning closeout.
Match drawings and labels
Wire, terminal, breaker and I/O labels should agree. Mark changes on drawings and have a second person verify the field.
Leave a searchable handover package
Deliver source drawings, device lists, software version and backups in an organized folder with a named revision owner.